Custom bar design & build | Riverstage
Location: Brisbane, QLD
Event type: Custom bar design-build
Client: Brisbane City Council
Venue: Brisbane
Capacity: Up to 9,000
Bar staff: Up to 100
Northbourne collaborated with Brisbane City Council to design and build a custom bar for Riverstage in Brisbane. The purpose-built bar structure has elevated the offerings to increase customer engagement and boost revenue.
Riverstage key deliverables
Concept development and design consultation tailored to venue layout, capacity, and audience profile.
Collaboration with designer, Brisbane City Council, and event producers to align bar design with operational flow and site logistics.
Production of detailed bar layouts, elevations, and service schematics for client approval.
Custom fabrication of modular bar infrastructure, including counters, back-of-house storage, keg systems, and decorative finishes.
Integration of plumbing, electrical, refrigeration, and beer reticulation systems to meet venue and supplier requirements.
Coordination of all required building, structural, and safety certifications.
Procurement and installation of back-of-house equipment (e.g. ice wells, speed rails, sinks, fridges, and tap systems).
Custom branding and signage solutions, including illuminated logos, menu boards, and point-of-sale integration.
Design and implementation of efficient staff workflow zones to maximise service speed and reduce congestion.
Integration of sustainability measures such as reusable serviceware stations and energy-efficient cooling systems.
Coordination of delivery, transport, and on-site installation within event bump-in schedules.
Liaison with venue management and local authorities to ensure compliance with building, safety, and liquor licensing requirements.
On-site supervision during installation and testing to ensure seamless handover.
Optional provision of ongoing maintenance, storage, and refurbishment between events.
Development of modular and scalable bar systems adaptable to touring or multi-site events.
Post-build documentation, including as-built drawings, materials register, and maintenance guidelines.
Coordination with Northbourne’s operational teams for immediate transition to event-day bar service.